CNI is strategically investing in various initiatives to enhance productivity and align with our long-term mission and vision. These investments encompass areas such as infrastructure development, technological advancements, talent acquisition, and process optimization. By proactively investing in these key areas, CNI aims to drive sustainable growth, foster innovation, and deliver exceptional value to our clients and stakeholders.
CNI International Seaport
An integrated seaport facilitating direct loading of our fabricated products onto jumbo ships.
International Seaport
20,000 DWT
• Heavy Duty Jetty •
4,000 m2 (L120 x W30 m)
• Max. B load •
20 Mt./ m2
The port is registered as an international (special) seaport, enabling the direct reception of specialized jumbo ships of up to 20,000 DWT at the dock.
Year of Completion
2025
Oversized/ Overweight Factory
CNI’s upcoming factory for oversized/ overweight projects
Factory
80,000 m2
• Oversized/ Overweight Factory •
65,000 m2
• Indoor Workshop •
35,000 m2
• Open Yard •
15,000 m2
Year of Completion
2025
With this new invested facility, CNI can fabricate:
- Reactors, towers and columns of any size and weight for Oil & Gas and Chemical industry;
- Boiler, steam drum and HRSG for thermal power plant;
- Huge-sized steel structures, such as monopiles, tripods for offshore wind towers, pre-fab steel sections for offshore platforms, modules, etc.
Indoor Fabrication Area
- 03 main workshops (50 x 160 m/ each, no middle column), divided into 02 assembly & welding lines in each workshop
- 01 blasting and painting booth (30 x 160 m)
- 01 stainless steel fabrication workshop (30 x 160 m)
- 02 overhead cranes (200 Mt./ each) operating over each main workshop
- 03 semi-gantry cranes (30 Mt./ each) operating over each assembly and welding line
- 04 SPMT modules (6 axles x 70 Mt./ axle)
Open Yard
- Heavy piling to reach bearing load 15 Mt./ m2
- 02 crawler cranes, cap. 1,250 Mt./ each, operating in tandem on the open yard area & the wharf platform, allowing lift of max. 1,500 Mt./ item to unload super heavy products on the project ship.
HRSG Factory
CNI’s upcoming factory for Heat Recovery Steam Generator
Factory
20,000 m2
Year of Completion
2024